South-Central IL- 450+ kW systems
Ability to predict long term operating costs across 4 locations
South-Central IL- 450+ kW systems
Ability to predict long term operating costs across 4 locations
Assumption, IL- 272 kW system Eliminated 90% of electric bill leveraging net metering laws
Breese, IL- 256 kW ground mounted system Achieved a net-negative system cost thanks to earned incentives
Columbia, IL - 79kW system 3% net cost with available incentives
3407 S. Jefferson Ave.
St. Louis, MO 63118